Wednesday, 22 October 2014

BIM USES ON THE PROJECT

  With reference to the BIM requirements on the project, the following BIM Users have been identified (Penn State University; The Computer Integrated Construction Research Program,2010)

Design Authoring: A process in which BIM software/Technology is used to develop a Building Information Model from available design intent input documentation, incorporating metadata and other requirements to successfully translate design intent into a BIM.
Design Coordination: A process in which Clash Detection software is used during the coordination process to determine field conflicts by comparing 3D models of building systems.
4D Modeling : Process in which a 4D model(3D models with the added dimension of time ) is utilized to effectively plan the phased occupancy in a renovation, retrofit ,addition, or to show the construction sequence and space requirements on a building site.
Existing Conditions Modeling: A process in which a project team develops a BIM reflecting existing conditions on the site, including locati0on facilities, graded levels etc.
Site Utilization Planning: A process that uses construction simulation based modeling to represent both permanent and temporary facilities on site and related construction activities.

As-Built Modeling: A process used to depict an accurate representation of the actual condition of the Building in a BIM.