Better coordination and communication between project participants
Faster and more effective processes
Better design
Increased cost control
Better production quality
Up to 40% elimination of unbudgeted change.
Cost estimation accuracy within 3%.
Up to 80% reduction in time taken to generate cost estimates.
A savings of up to 10% of the contract value (early clash detections).
Up to 7% reduction in project time.
Faster and more effective processes
Better design
Increased cost control
Better production quality
Up to 40% elimination of unbudgeted change.
Cost estimation accuracy within 3%.
Up to 80% reduction in time taken to generate cost estimates.
A savings of up to 10% of the contract value (early clash detections).
Up to 7% reduction in project time.